February 13, 2005
The inside walls are going up - we're getting a good idea of how the space will be when it's through.  The excitement grows with the building.  We are thankful for the opportunity to work with a great construction crew.

   Feb13-04-HoldingRopeForBeam.jpg (80703 bytes)    Feb13-03-welding.jpg (83285 bytes)   Feb13-05-BridgeBeams.jpg (70278 bytes)

  Feb13-07-Inside02Andrea.jpg (80574 bytes)   Feb13-06-Inside01.jpg (76592 bytes)   Feb13-09.jpg (72686 bytes)

Feb13-08.jpg (75206 bytes)
______________________________________________________________________

Early February 2005

FebruaryConstructionGroupShot01.jpg (88481 bytes)    FebruaryConstruction01.jpg (66896 bytes)   FebruaryConstruction02.jpg (78812 bytes)

FebruaryConstructionInside01.jpg (89742 bytes)    FebruaryConstructionInside02.jpg (79414 bytes)

FebruaryConstruction05.jpg (73446 bytes)   FebruaryConstruction07.jpg (75311 bytes)

______________________________________________

Mid January Update
2nd Floor Roof supports

AYC2ndFloorAndRoof04.jpg (92541 bytes)  AYC2ndFloorandRoof02.jpg (111057 bytes)  AYC2ndFloorAndRoof03.jpg (85183 bytes)

AYC2ndFloorAndRoof06.jpg (87733 bytes)  AYC2ndFloorAndRoof09a.jpg (77798 bytes)

____________________________________________________________________________
2nd Floor Walls Going Up!
Photos taken January 10, 2005

2ndFloorWalls01.jpg (61279 bytes)   2ndFloorWalls02.jpg (82110 bytes)

2ndFloorWalls04.jpg (75873 bytes)   2ndFloorWalls05.jpg (66247 bytes)

<--Previous Gallery      Gallery Home        Next Gallery-->

Our General Contractor is:
Marinoni Construction

Architect:
Stephen L. Morrill, AIA